PROJECT DETAILS
Base Build Value : £47m
Size : 95,000m2
Height : 18 – 24m
Programme : 50 Week
Year : 2014 to 2015

SERVICES PERFORMED
Mechanical Design
Electrical Design
Sprinkler Design

Sainsbury’s – DIRFT

MBA were delighted to be involved in the design and construction of a new distribution centre for general merchandising and dry good supplies to the ever increasing Sainsbury’s store network.

The site benefited from a multi modal logistics with truck and train terminals for the shipping of bulk quantities of goods across the UK via road and rail networks.

Consisting of a high and low bay building arrangement which utilises Mechanical Handling Equipment in the form of conveyors, high bay cranes and static racking solutions, the project was executed on a shell and fit out basis, with MBA involved from Concept to completion to ensure that all of the building services requirements were fully integrated.

The building was future proofed for the introduction of a 4.5MW PV array installation, which is due for installation in the coming years following completion.