PROJECT DETAILS
Base Build Value : £60m
Size : 36,000m2
Height : 16m
Programme : 50 Week
Year : 2010 to 2012

SERVICES PERFORMED
Mechanical Design
Electrical Design
Refrigeration Design
Insulation Design
Sprinkler Design
Incoming Services

Ocado, Dordon- Multi Temperature Warehouse

MBA were pleased to be involved in the construction of CFC2 located at Birch Coppice near Tamworth, a new Customer Fulfilment Centre for the food home delivery retail market. The building has multi-tier mezzanines installed throughout maximising the footprint of the facility.

The project was executed on a shell and fit out basis, with MBA involved from Concept to completion to ensure that all of the building services requirements were fully integrated with the high technology automation system[s], which included conveyors, MASSOPS, mini load and high bay cranes together with an ASRS system.

We designed a single envelope facility enabling the building to be future proofed to permit simple future expansion along with a direct Ammonia Refrigeration plant to maintain space temperatures in the facility.

MBA were responsible for the design and co-ordination of the building services installations including the interface to the automation equipment.